Results
- Initial cost
- -
- Setup time
- -
- Crafting DC
- -
- Remaining cost
- -
Check odds
| Value | Success | Critical success |
|---|---|---|
| Cost reduction per day | - | - |
| Additional days to finish | - | - |
| Days required (with setup) | - | - |
| Cost to finish now | - | - |
| Total cost | - | - |
| Total days spent | - | - |
"Cost to finish now" is what you still pay in materials after the additional days chosen above. On a failure you salvage all the materials; on a critical failure you lose 10% of them.